Notice of Beijing Municipal Bureau of Ecology and Environment on Issuing the "Implementation Measures for the Pilot Linkage of Environmental Impact Assessment of Beijing Industrial Park Planning and E
Notice [2022] No.12
In order to further optimize the business environment, deepen the "streamline administration, delegate power, strengthen regulation and improve services" reform, and implement the requirements of the pilot work of business environment innovation, according to the State Council’s Opinions on Carrying out the Pilot Work of Business Environment Innovation (Guo Fa [2021] No.24) and the Ministry of Ecology and Environment’s Opinions on Further Strengthening the Environmental Impact Assessment of Industrial Park Planning (Huan EIA [2020] No.65), our bureau organized and compiled the Beijing Industrial Park Planning.
This is for your information.
Attachment: Implementation Measures for the Pilot Linkage of Environmental Impact Assessment of Beijing Industrial Park Planning and Environmental Impact Assessment of Construction Projects
Beijing Municipal Bureau of Ecological Environment
May 31, 2022
attachment
Measures for the pilot implementation of linkage between environmental impact assessment of Beijing industrial park planning and environmental impact assessment of construction projects
In order to implement the State Council’s Opinions on Developing Pilot Work of Business Environment Innovation (Guo Fa [2021] No.24) and the Ministry of Ecology and Environment’s Opinions on Further Strengthening the Planning Environmental Impact Assessment of Industrial Parks (EIA [2020] No.65), meet the requirements of "three lines and one order" ecological environment zoning control, give full play to the macro-leading role of planning environmental impact assessment, and continuously optimize the business environment, To promote the linkage between the planning environmental impact assessment of industrial parks (hereinafter referred to as "planning EIA") and the environmental impact assessment of construction projects (hereinafter referred to as "project EIA"), and to promote the quality improvement and efficiency improvement of project EIA, these Measures are formulated in accordance with the Environmental Impact Assessment Law of the People’s Republic of China, the Regulations on Planning Environmental Impact Assessment, and the Regulations of Beijing Municipality on Optimizing the Business Environment.
I. Basic requirements
In industrial parks where the environmental quality meets the relevant assessment requirements of the state and this Municipality and the environmental management system is relatively sound, the linkage reform of planning EIA and project EIA will be implemented. According to the degree of environmental impact and environmental risk, the construction projects settled in industrial parks will be classified and optimized for environmental impact assessment procedures, and supervision during and after the event will be strengthened, management methods will be changed, management efficiency will be improved, and the reform of examination and approval system will be deepened to promote the high-quality development of industrial parks.
Second, the scope of application
(1) An industrial park shall meet the following conditions
1. The planning EIA has been completed in accordance with the law, and the conclusions and review opinions of the planning EIA have been adopted and implemented;
2. The environmental quality of the industrial park conforms to the relevant assessment requirements of the state and this Municipality in the previous year, and has not been included in the regional approval scope by the competent department of ecological environment;
3. The environmental infrastructure of the industrial park is perfect and stable;
4. The environmental management and risk prevention and control system of the industrial park is sound and no major environmental incidents have occurred in the past five years.
The list of industrial parks linked by planning EIA and project EIA shall be issued by the Municipal Bureau of Ecology and Environment according to the principle of "mature batch and promote batch".
(two) the construction project shall meet the following conditions
The construction projects settled in the industrial park meet the planning function orientation and layout of the park and the environmental access requirements of the "three lines and one single" ecological environment zoning control and planning environmental assessment in this city.
Third, the linkage content and requirements
In accordance with the relevant provisions of the state and the classified management of environmental impact assessment of construction projects in this Municipality, the procedures for optimizing environmental impact assessment of construction projects in industrial parks shall be handled:
(A) the decentralization of examination and approval authority
For the construction projects settled in the industrial park, except those which belong to the approval authority and confidential level of the Ministry of Ecology and Environment, the environmental impact assessment documents of other construction projects are approved by the competent department of ecology and environment in the area where the industrial park is located. If it is inconsistent with the Catalogue of Construction Projects with the Management Authority of Environmental Impact Assessment Document of Beijing Municipal Bureau of Ecology and Environment (2022 edition), this document shall prevail. Unless otherwise provided by the municipal government, such provisions shall prevail.
(2) Exempting from handling environmental impact assessment procedures.
1. Construction projects that should fill in the environmental impact registration form according to the classified management list of environmental impact assessment of national construction projects and the detailed implementation regulations of this Municipality may be exempted from filing the environmental impact registration form.
2. According to the classified management list of environmental impact assessment of national construction projects and the detailed regulations of this Municipality, the environmental impact report form should be prepared and the construction projects in the "List of Projects Exempted from Environmental Assessment Procedures in Industrial Parks" (see Annex 1) are exempt from environmental impact assessment procedures.
(3) Optimize the procedures for environmental impact assessment.
Construction projects that are not included in the "List of Environmental Risk Management and Control Projects in Industrial Parks" (see Annex 2) and should prepare an environmental impact report (table) according to the classified management list of environmental impact assessment of national construction projects and the detailed implementation regulations of this Municipality may be subject to the management of notification commitment for examination and approval. With specific reference to the Notice of the Beijing Municipal People’s Government Administrative Examination and Approval System Reform Office on Printing and Distributing the Administrative Measures for the Approval of Informed Commitments of Administrative Services in Beijing (Beijing Trial Reform Office [2020] No.1); If publicity is required according to law, a formal reply will be issued to the construction unit after the completion of publicity.
(4) Innovative handling methods
The same type of small and micro enterprise projects, on the basis of clarifying the corresponding responsible subjects, can be bundled to carry out environmental impact assessment approval, and put forward pollution prevention and control requirements in a unified way, and individual projects will not repeat environmental impact assessment.
(E) Simplify the evaluation content
According to the classified management list of environmental impact assessment of national construction projects and the detailed regulations of this Municipality, the environmental impact report (table) should be prepared, and the relevant evaluation contents should be simplified, including:
1. No longer analyze the relevant laws, regulations and ecological environment protection policies that have been discussed in the planning EIA;
2. The environmental rationality and feasibility of site selection can refer to the conclusion of planning EIA;
3. The content of environmental function zone judgment can directly refer to the conclusion of planning EIA;
4. The results of environmental status monitoring and environmental quality status evaluation can refer to the effective data and related contents in the planning EIA (except that the regional environmental quality shows a downward trend or the project adds new characteristic pollutants);
5. If the infrastructure of the supported industrial park has been running stably, the project EIA only needs to explain the supporting situation, and there is no need to carry out the supporting feasibility analysis.
(6) linkage of pollutant discharge permit
Bundling to carry out EIA projects, enterprises (construction units) in the application for sewage permits can be bundled EIA approval as their EIA approval documents; For projects exempted from environmental assessment procedures, settled enterprises (construction units) do not need to provide environmental impact assessment documents when applying for pollutant discharge permits.
Iv. identification procedures
The Municipal Bureau of Eco-environment, in combination with the "three lines and one order" eco-environment zoning control requirements and planning EIA requirements of this Municipality, organizes the identification of linkage between planning EIA and project EIA according to the development of planning EIA of industrial parks in this Municipality; The competent departments of ecological environment in each district shall be responsible for organizing the declaration work to be included in the linkage pilot industrial park within their respective jurisdictions. The relevant procedures are as follows:
(1) declaration
Industrial parks that meet the requirements of linkage between planning EIA and project EIA shall be declared according to the principle of voluntary application. The competent ecological and environmental departments of all districts shall do a good job in organizing the declaration, and in principle declare it once every six months (end of June 2022 and end of December 2023). See Annex 3 for the template of linkage declaration.
(2) Identification
The Municipal Bureau of Ecology and Environment organized the identification work, and timely fed back the identification results, and put forward rectification suggestions for existing problems.
(3) Release list
The Municipal Bureau of Ecology and Environment is responsible for publishing the list of industrial parks linked by planning EIA and project EIA.
V. Implementing the responsibilities of all parties
City, district ecological environment departments, industrial park management departments, enterprises (construction units) to form a joint force, high-quality promotion of planning EIA and project EIA linkage work, and effectively play the role of planning EIA in optimizing industrial layout and ecological security pattern, and promote high-quality economic development.
(A) the competent department of ecological environment should strengthen service and supervision.
City, district ecological environment departments do a good job in planning EIA and project EIA linkage policy propaganda; Combined with double random spot checks, strengthen supervision after the event, timely check the plans with significant adverse effects, put forward improvement opinions or suggestions to the management department of industrial parks, and deal with acts that destroy the ecological environment in strict accordance with the law and regulations; By strengthening information disclosure and public supervision, we will build a comprehensive supervision system involving the government, enterprises and the public.
The competent departments of ecological environment in each district shall organize the inspection of the implementation of the environmental impact assessment of industrial parks, and urge the rectification if the relevant requirements of the environmental impact assessment of the planning are not implemented; Strengthen the supervision of environmental quality changes and pollutant emissions in industrial parks, carry out law enforcement monitoring according to law, and implement regulatory responsibilities.
(B) Industrial park management departments should strengthen overall management.
In accordance with the relevant provisions of the state and this Municipality, organize the preparation of planning environmental assessment (encourage carbon emission assessment); Organize the implementation of the planning EIA conclusions and review opinions, focusing on the total pollutant control and emission reduction tasks; Organize the environmental monitoring of the park, organize the rectification of existing ecological and environmental problems, and grasp the responsibility of environmental protection; Organize follow-up evaluation of those that may have a major ecological and environmental impact and have been implemented for 5 years without major adjustments; If major adjustments or revisions are made to the approved plan, such as its scope of implementation, applicable period, scale, structure and layout, the environmental impact assessment shall be re-organized or supplemented; Organize and carry out ecological environment-related policy propaganda, guide and help enterprises (construction units) settled in the park to implement linkage measures; Do a good job in sharing relevant data in planning EIA, and provide convenient conditions for simplifying the evaluation content.
(three) enterprises (construction units) to implement the main responsibility of ecological environment.
Enterprises (construction units) settled in the park should strictly abide by the requirements of laws and regulations related to the ecological environment, earnestly fulfill the main responsibility of ecological environment protection, implement the responsibility of environmental risk prevention, and do a good job in various ecological environment protection measures, especially those specified in the EIA documents, EIA approvals and pollutant discharge permits, to ensure that pollutants meet the standards.
For projects exempted from EIA procedures, the legal obligation of the construction unit (resident enterprise) to protect the ecological environment is not exempted. The construction unit (resident enterprise) shall, in accordance with the relevant requirements of the environmental protection management of construction projects, do a good job in the environmental protection design of the projects, and implement the ecological environmental protection requirements put forward by laws, regulations, standards and technical specifications.
Sixth, the pilot requirements
The competent departments of ecological environment in relevant areas should do a good job in scheduling the related work of the linkage pilot industrial park, find problems in time, and report to the Municipal Bureau of Ecological Environment; Keep in touch with the management department of the industrial park, sort out the construction projects in the industrial park, sum up the pilot work experience, explore new reform measures, and form experiences that can be popularized and replicated. For the parks with major problems in the linkage pilot, the Municipal Bureau of Ecology and Environment will terminate the linkage pilot of the industrial park.
For areas with linkage pilot industrial parks, the competent departments of ecological environment in relevant areas shall submit a summary of the linkage pilot work of industrial parks to the Municipal Bureau of Ecological Environment before the end of January each year.
These Measures shall come into force on June 1, 2022 and shall be valid for two years.